2018 was a challenging year trying to get the car to this point with frustration and joy in equal measure. First MOT last year picked up a few issues and although not needed, I’m glad it was done so it forced me to get things sorted. So, once the essentials were done and after months of pondering I decided to press on with the tunnel ram install. Wow what a difference it’s made
![Shocked :shock:](./images/smilies/icon_shocked.gif)
I figured that as the car is already far from original and it already had a gaping hole in the bonnet I might as well tidy it up. I’ve also been busy with:
- new side exit exhausts
- new passenger and drivers floor
- repaired fuel tank
- repaired side marker lights
- removed heating (wasn’t plumbed or working anyway)
- high torque mini starter and battery
- billet MSD distributor and leads
- currently going through wiring.....